NSITE DOCUMENT

02-TaskOrder2017-1-GAIConsultants.pdf

  • Library: Purchissues
  • Year Created: 2019
  • File Type: PDF
The document details the tasks and deliverables for the construction document phase, including the preparation of design development documents and CAD generated construction drawings with CSI formatted specifications. It covers plans for grading, water features, walls, signage, electrical and lighting, landscaping, and irrigation, specifying information like cover sheets, general notes, stormwater pollution prevention plans, site plans, and structural plans.
MEMBERS ONLY DOWNLOAD
Advertisement