NSITE DOCUMENT

RDBS - DRAFT.pdf

  • Library: Purchissues
  • Year Created: 2017
  • File Type: PDF
The document provides guidelines for submitting Alternate Technical Proposals for a construction project. Design-Builders can propose changes to the original design criteria, as long as the proposed price is equal to or lower than the Base Proposal. Detailed explanations, risk assessments, and benefits of the proposed changes must be included in the submission. The Competitive Selection Committee (CSC) evaluates these proposals and determines their acceptance based on merit. If approved, the Adjusted Bid is calculated using the proposed price and CSC scores. The document also addresses the evaluation process, selection criteria, insurance requirements, proposal submission procedures, CSC decision-making role, and tiebreaker procedures for identical Adjusted Bids.
MEMBERS ONLY DOWNLOAD
Advertisement