The provided PDF document outlines the calculation of liquidated damages for the Pine Grove Project Segment based on factors such as length, number of lanes, average annual daily traffic (AADT), posted speed, AADT per lane, and travel time per hour. It also includes information on the detour route, added travel length, added travel time, vehicle operation cost, travel time cost, and total potential liquidated damages per day on a road user cost basis. The document specifies the auto cost, Georgia hourly costs, and the total costs incurred, while noting that accident costs are not included in the calculation.