DOCUMENT

ITB - Gasoline and Diesel Fuel (Transport and Tank Wagon 2013

  • YEAR CREATED: 2013
  • ENTITY TYPE: County
  • TYPE OF DOCUMENT: BID - ITB, IFB, ITT, RFB
The document outlines the requirements and guidelines for subcontracting and minority business participation in a contract with Baltimore County. The prime contractor is expected to estimate the participation level of subcontractors and suppliers for the full term of the contract. The contractor must make a genuine effort to comply with the county's minimum 15% subcontracting goal, even if they have the capability to complete the work with their own workforce. All prime contractors and MBE/WBE sub-contractors are required to report monthly through an online system called PRISM. Failure to report in a timely manner may result in noncompliance. The document also mentions the requirement for electronic version submission of bid proposals in PDF format.
MEMBERS ONLY DOWNLOAD
Advertisement

Similar Documents