DOCUMENT

ITB - Annua lCropping Plan 2009

  • YEAR CREATED: 2009
  • ENTITY TYPE: State
  • TYPE OF DOCUMENT: OTHER
The document outlines the scope of work for a contractor who will be responsible for developing and implementing an annual cropping plan report for a wastewater management system. The report is to be submitted to the Regional Board by January 15th each year and will include information such as contact lists, crop maps, field logs, irrigation methods, nitrogen balance, soil analysis, and other relevant facility management information. The contractor will also be responsible for creating quarterly authorized disposal site monitoring reports, which will reflect the actual operations during a crop cycle and compare them to the annual cropping plan. To qualify for this contract, the contractor must have qualifications as a soil scientist, consultant, or agronomist and will be required to provide proof of experience. They must also have liability insurance coverage and provide a certificate of insurance. The contractor will be liable for any damages or injuries caused by their negligence, and they must guarantee that all analyses will be completed by the deadline. The document also provides contact information for the California Department of Corrections and Rehabilitation (CDCR) Management Branch, including phone and fax numbers. This information can be used to inquire further about the bidding process or seek clarification on any aspects of the document.
MEMBERS ONLY DOWNLOAD
Advertisement

Similar Documents