DOCUMENT

ITB - Water Line Extension 2007

  • YEAR CREATED: 2007
  • ENTITY TYPE: City/Township
  • TYPE OF DOCUMENT: BID - ITB, IFB, ITT, RFB
The document provides information about the submittal process and requirements for the Grimes Bridge Road Waterline Improvements project, specifically focusing on soil erosion and sediment control. The document outlines the different markings and comments that will be used to indicate the status of submittals to the Contractor, including "Reviewed," "Revise and Resubmit," "Furnish as Corrected," and "Rejected." It also states that the Engineer will return three copies of reviewed shop drawings to the Contractor for distribution. The document further explains the process for resubmission, stating that corrections and changes indicated in unacceptable submissions should be made and resubmitted until they comply with the Contract Documents. It also emphasizes the need to direct specific attention to revisions other than corrections requested by the Engineer in previous submissions. Regarding distribution, the Contractor is responsible for obtaining and distributing copies of submittals to subcontractors and material suppliers. The Contractor is also required to maintain a file of processed submittals for the duration of the project and deliver a complete set to the Owner as part of the project closeout documents. The document then transitions to the section on soil erosion and sediment control, providing a summary of the materials and processes involved. It states that the Contractor is responsible for implementing best management practices to prevent and minimize erosion and sedimentation during and after construction. References to the Manual for Erosion and Sediment Control in Georgia (the "Green Book"), the State of Georgia Department of Transportation Standard Specifications, and the National Stone Association Aggregate Classification are provided. The document also highlights the importance of regulatory compliance, stating that land disturbance activities cannot begin until all required erosion and sediment control permits are obtained. The Contractor is expected to comply with all laws, rules, regulations, ordinances, and requirements concerning soil erosion and sediment control. Definitions for terms such as "Contractor" and "Qualified Personnel" are provided, clarifying their meanings within the context of the document. The document then moves on to the section on products, specifically focusing on temporary sediment barriers (silt fence). It specifies that the silt fence shall comply with the specifications in the Manual for Erosion and Sediment Control in Georgia. It also provides instructions for the installation of silt fence, including the use of posts and fabric. Finally, the document concludes with the execution section, which provides instructions for the installation of silt fencing. Overall, the document serves as a comprehensive guide for the submittal process and the implementation of soil erosion and sediment control measures for the Grimes Bridge Road Waterline Improvements project.
MEMBERS ONLY DOWNLOAD
Advertisement

Similar Documents