DOCUMENT

ITB - Kitchen Equipment Repairs 2006

  • YEAR CREATED: 2006
  • ENTITY TYPE: County
  • TYPE OF DOCUMENT: BID - ITB, IFB, ITT, RFB
The document outlines the terms and conditions for a contract between a contractor and a county. The document covers various aspects such as the contractor's responsibilities, utilities, compliance with codes and regulations, work procedures, subcontracting, labor rates, invoicing, and security requirements. The contractor is expected to evaluate and repair equipment problems within a specified timeframe, provide price quotes for repair work, and coordinate with the county for planned interruptions. All materials and work must comply with Baltimore County Codes and Regulations, NEC National Electrical Code, NFPA National Fire Protection Association, ASHRAE American Society of Heating, Refrigerating and Air Conditioning Engineers, and ARI Air Conditioning and Refrigeration Institute. The contractor is not allowed to subcontract the assigned work, except for tasks outside their trade. The labor rates should include travel means, equipment, and tools, while the county will only pay for actual work time. The contractor's invoice must include detailed information about hours, materials, work description, and copies of manufacturer's/vendor's invoices and daily work orders. The payment will be based on a time and materials basis. The contractor must have at least four skilled mechanics available and attend a security orientation conducted by the Bureau of Corrections. The county may conduct background investigations on the contractor's employees and remove any individuals deemed unfit.
MEMBERS ONLY DOWNLOAD
Advertisement

Similar Documents