DOCUMENT

ITB - Environmental Site Assessment 2007

  • YEAR CREATED: 2007
  • ENTITY TYPE: Authority: Housing
  • TYPE OF DOCUMENT: BID - ITB, IFB, ITT, RFB
The document is a solicitation for Phase 1 and Phase 2 Environmental Assessment Services. The document outlines the requirements and scope of work for conducting a Phase 1 Environmental Assessment, which includes facilitating the acquisition of a property, conducting an all-appropriate inquiry, identifying potential sources of hazardous substances, and defining any future releases of hazardous substances. The final report must comply with the ASTM Standard Practice for Environmental Site Assessments. The document also mentions the need for a Phase 2 Environmental Assessment, which must be conducted in accordance with the ASTM Standard E1903. A work plan for the Phase 2 assessment must be prepared and approved by the client, and it should include the minimum level of testing necessary to make informed determinations. The environmental contractor is responsible for coordinating field activities with the landowner, conducting necessary sampling, and documenting the field activities and analytical testing results in a final report. The document also includes a general response section for interested vendors to provide their company information, acknowledge any addenda, indicate their qualifications, and provide cost and timeline estimates. Additionally, there is a section for vendors to provide references and capabilities. The document also includes an affidavit section where vendors need to state that they have not colluded, conspired, connived, or agreed with any other parties, including themselves, to manipulate the bidding process. This affidavit ensures that the bid is genuine and not influenced by any fraudulent activities.
MEMBERS ONLY DOWNLOAD
Advertisement

Similar Documents