DOCUMENT

ITB - Water & Sewer Design Services 2006

  • YEAR CREATED: 2006
  • ENTITY TYPE: County
  • TYPE OF DOCUMENT: BID - ITB, IFB, ITT, RFB
This document is a set of instructions and requirements for the design phase of a construction project. It outlines the tasks and deliverables that the consultant is responsible for during this phase. The document includes instructions for preliminary engineering, site plan submission, grading permit application, and the preparation of construction documents. It also mentions the need for field surveys, geotechnical studies, and coordination with various agencies for permits and approvals. The consultant is required to provide detailed calculations, drawings, and documentation, as well as obtain approvals from relevant authorities. The document emphasizes the importance of adhering to codes and standards, and includes specific instructions for delivering electronic files and submitting physical copies of plans and specifications. Additionally, the document mentions that the consultant should consider general market conditions and provide a revised Construction Cost to the County, which includes any necessary adjustments based on those conditions.
MEMBERS ONLY DOWNLOAD
Advertisement

Similar Documents