DOCUMENT

RFP - Professional Testing Services 2009

  • YEAR CREATED: 2009
  • ENTITY TYPE: City/Township
  • TYPE OF DOCUMENT: RFP - Request for Proposals
This document provides information on the coordination and scheduling of tests, inspections, and quality-control services for construction projects. It emphasizes the need for coordination to minimize delays and the removal and replacement of construction for testing purposes. The document also mentions the requirement for a schedule of tests and inspections to be submitted within 30 days of the project's commencement. It highlights the importance of distributing this schedule to relevant parties involved in the project. The document further discusses the conduct of special tests and inspections by qualified testing agencies as required by authorities and specified in individual sections of the contract documents. It outlines the responsibilities of the testing agency, including verifying manufacturer procedures, reporting irregularities and deficiencies, submitting written reports, interpreting test results, and retesting and reinspecting corrected work. The document also briefly mentions the inclusion of traveling expenses in testing laboratory rates and the requirement for approval for overtime payment. It provides instructions for preparing a test and inspection log, including recording the date, description of the work, date of transmission of results, and identification of the testing agency. It emphasizes the need to maintain and update the log at the project site for reference by the architect and construction manager. Lastly, the document addresses the repair and protection of construction after testing and inspection services, including the use of specified materials and compliance with installation requirements. It states that the responsibility for repair and protection lies with the contractor, regardless of the assignment of responsibility for quality-control services.
MEMBERS ONLY DOWNLOAD
Advertisement

Similar Documents