DOCUMENT

RFP - Feasibility Study, Transit Transfer Center 2003

  • YEAR CREATED: 2003
  • ENTITY TYPE: City/Township
  • TYPE OF DOCUMENT: RFP - Request for Proposals
This document provides information about two tasks related to a project. Task 7.3 is about the Final Report. It states that the report will incorporate comments to the Draft Report, and if there are no substantial comments, this report may be eliminated as a deliverable. The deliverable for this task is the Final Report in Microsoft Word format, with twenty-five copies and a reproducible original on disk. Task 8 is about the Conceptual Design. The objective is to determine the best design for the selected site, considering aesthetics and costs. Subtask 8.1 involves developing conceptual site plans that include site circulation, loading areas, drop-off areas, and ramp requirements for parking. The plans should also convey the aesthetic presentation of the design, major features and amenities for passengers, landscaping, and lighting. The deliverable for this subtask is drawings on a reproducible format and 11 x 17 reductions for report preparation. Subtask 8.2 involves presenting scale elevations of the exterior of the proposed facility, indicating potential finish materials and landscaping plans. The relationship between this design and adjacent structures, as well as its relationship to existing and applicable design guidelines, will be discussed. The deliverable for this subtask is drawings on a reproducible format and 11 x 17 reductions for report preparation.
MEMBERS ONLY DOWNLOAD
Advertisement

Similar Documents