DOCUMENT

RFP - Concrete Paving Services 2009

  • YEAR CREATED: 2009
  • ENTITY TYPE: County
  • TYPE OF DOCUMENT: RFP - Request for Proposals
The document provides information about the operation and requirements of a construction contract. It states that the contractor must submit a progress schedule to the engineer before starting work. The street listing in the proposal is a partial representation of the work to be done, and the engineer has the right to add or delete streets as needed. The engineer also has the right to make alterations to the work as necessary. Stockpiling is only allowed at the discretion of the engineer. The contractor is responsible for investigating and understanding the conditions affecting the work, including transportation, labor, weather, and equipment. The contractor must also be aware of any obstacles or difficulties that may arise during the work. The county assumes no responsibility for the contractor's interpretations of the information provided. Grades for curb and gutter will be directed by the engineer, and sidewalk grades will be uniformed between existing sections. The street listing should not be misconstrued as the order of work, as the contractor has the flexibility to determine the strategy and methods for completing the work. Tree roots encountered during the removal and replacement of concrete must be saw cut and removed, with any voids filled and compacted as directed by the engineer. The cost of removing tree roots is incidental to the concrete pay items in the contract.
MEMBERS ONLY DOWNLOAD
Advertisement

Similar Documents