DOCUMENT

RFP - Construction Egnineering Viaduct Reconstruction 2009

  • YEAR CREATED: 2009
  • ENTITY TYPE: City/Township
  • TYPE OF DOCUMENT: RFP - Request for Proposals
The document provides information about a construction project for the reconstruction of Wacker Drive Viaduct and Congress Parkway Interchange in the city. The project includes various tasks such as columns and partial foundation removal, additional caisson, new grade beam, new columns, and a post-tension high-performance concrete deck with a latex modified concrete overlay. It also involves improving drainage, lighting, and traffic signals, rehabilitating bridges, installing a new ventilation system for Lower Wacker Drive, coordinating with adjacent property owners, community groups, and various city, state, and federal departments. The document outlines the roles and responsibilities of the Wacker Drive Program Manager, Senior Project Manager, Cost/Scheduling Engineer, and Quality Assurance Engineer. It also provides a detailed scope of consultant construction engineering services during the pre-construction, construction, and post-construction phases. The proposal submission requirements include a cover letter, executive summary, details of past relevant projects, identification of key personnel and their roles, and an organizational chart. The document emphasizes the need for firms to demonstrate experience in similar projects of comparable magnitude and complexity. Additionally, the qualifications of the key personnel proposed must be equal or better than the qualifications of the key personnel originally proposed. Overall, the document provides a comprehensive overview of the construction project, its scope, and the requirements for submitting a proposal, including the importance of demonstrating relevant experience and the qualifications of key personnel.
MEMBERS ONLY DOWNLOAD
Advertisement

Similar Documents