DOCUMENT

ITB - Demolition Services Former Bidwell Property Re-Bid 2004

  • YEAR CREATED: 2004
  • ENTITY TYPE: County
  • TYPE OF DOCUMENT: BID - ITB, IFB, ITT, RFB
The document includes various sections related to a project bid response. It starts with a request for a resume of the project manager proposed for the project. It then includes a listing of all projects undertaken by the company in the last five years, specifying if any of them resulted in arbitration, litigation, claims, violations, or liens. The document also includes sections for compliance certifications, where the bidder certifies that their bid complies with the attached specification documents, and provides a list of any deviations. There is a section for listing subcontractors anticipated to be used on the project, with instructions to submit the list with the bid or within 48 hours after the bid opening. The document also mentions the requirement for a bid deposit, with options for cash or surety bond. It includes an appendix for calculating liquidated damages in case of delays in completing the project, and another appendix for insurance requirements. The insurance requirements include the need for the contractor to provide evidence of insurance coverage and include the County of Spokane as an additional named insured on the contractor's general liability policy. The policy should be endorsed and the certificate should reflect that the insurance covers the limits of the company's liability.
MEMBERS ONLY DOWNLOAD
Advertisement

Similar Documents