DOCUMENT

ITB - Electrical Servi

  • ENTITY TYPE: County
  • TYPE OF DOCUMENT: BID - ITB, IFB, ITT, RFB
This document outlines the terms and conditions for a construction project. It states that the contractor must notify the PMDM (Project Manager or Designated Representative) 24 hours in advance before proceeding with any work. Unauthorized work will be at the contractor's risk and they will be responsible for its removal. The document also specifies the payment terms. Skilled journeyman, supervisors, and unskilled apprentices will be paid by the hour, including all costs, overhead, and profit. Materials incorporated in the work will be paid for based on the cost of materials multiplied by the contract mark-up. There is also a provision for the rental of a 30 cubic yard container for demolition debris. The rental price covers the time for filling the container and travel to the landfill. The contract price includes all costs, overhead, and profit. The demolition debris in the container will be paid for based on the contract price for landfill dumping charges. Landfill dumping charges will be paid for by the ton, including the cost of tipping fees, overhead, and profit. The contractor must provide copies of landfill scale tickets confirming the tonnage dumped along with their invoice. Lastly, the document states that all workmanship, materials, and equipment must comply with the specifications outlined in Attachment A, Division 16 Electrical Technical Specifications.
MEMBERS ONLY DOWNLOAD
Advertisement

Similar Documents