DOCUMENT

ITB - Asbestos Abatement Services 2001

  • YEAR CREATED: 2001
  • ENTITY TYPE: City/Township
  • TYPE OF DOCUMENT: BID - ITB, IFB, ITT, RFB
The document outlines the requirements and guidelines for asbestos abatement operations. It includes information on various aspects such as respirator fit testing, documentation, waste disposal, site security, pre-start meeting, materials and equipment, substitutions, execution, and support activities. The document emphasizes the need for proper documentation of respirator fit testing and disposal receipts for asbestos waste materials. It also highlights the importance of maintaining work site entry logbooks and routing negative air machine discharge ducting to the exterior of the facility. The contractor is responsible for site security and must ensure that no unauthorized persons enter the regulated area. A logbook must be maintained for recording the entry and exit of individuals from the regulated work area. The document also mentions the requirement for a pre-construction meeting and the submission of necessary submittals. It provides specifications for materials and equipment, including the use of flame retardant polyethylene sheeting and non-solvent-based encapsulants. The document states that respiratory protection should be based on actual area fiber counts and initial protection should be provided by a PAPR unless a valid negative exposure assessment is provided. It also mentions the process for proposing substitutions, which requires technical data and approval from the city. The document includes information on preparation, laboratory services, and the accreditation requirements for analyzing air samples and bulk material identification. The availability of results for air samples collected during abatement activities should be less than 24 hours.
MEMBERS ONLY DOWNLOAD
Advertisement

Similar Documents