DOCUMENT

ITB - Replacement of Fan Coils - Fire Admin and Police Property Building 2003

  • YEAR CREATED: 2003
  • ENTITY TYPE: County
  • TYPE OF DOCUMENT: BID - ITB, IFB, ITT, RFB
The document contains supplementary general conditions for a contract. It outlines various requirements and procedures that bidders and contractors must adhere to. Some key points mentioned in the document include: - The bidder must provide information and data to the owner to demonstrate their ability to perform the work. - The owner reserves the right to reject any bid if the bidder is deemed unqualified. - The bidder may need to submit information about the work they will perform, the suppliers of materials and equipment, and the subcontractors involved. - The owner has the right to object to proposed subcontractors, and the bidder may need to provide acceptable substitutes. - A pre-construction conference is mandatory unless waived by the owner. - The contractor is responsible for supervising and directing the work, as well as coordinating all aspects of the project. - The contractor must keep the premises clean and remove waste materials and tools upon completion of the work. - The contract requires first-class work and materials, and the owner may conduct tests to ensure compliance. - Any discrepancies or ambiguities in the contract documents must be promptly reported to the owner, who will provide written corrections. - The contractor must provide a representative for the final inspection, and any deficiencies must be promptly and permanently corrected before final acceptance of the work, which is the full responsibility of the contractor. Overall, the document provides guidelines and expectations for bidders and contractors to follow throughout the contract, ensuring that the work is performed to a high standard and any issues are addressed promptly.
MEMBERS ONLY DOWNLOAD
Advertisement

Similar Documents