DOCUMENT

ITB - Boiler Tube Replacement 2003

  • YEAR CREATED: 2003
  • ENTITY TYPE: City/Township
  • TYPE OF DOCUMENT: BID - ITB, IFB, ITT, RFB
This document provides instructions and guidelines for contractors who have performed work for the City of Worcester. It includes information on how to fill out a service slip, what information should be included on an invoice, and the procedures for addressing overcharging or disputes. The document also outlines the hourly and overtime rates that contractors should quote, as well as the rules regarding custodial coverage and mileage reimbursement. It emphasizes the importance of obtaining permission from the relevant department before performing any repairs and highlights the need for a mandatory meeting between the contractor and school officials. Additionally, on page 18, the document mentions the Coordinator of Maintenance Services and provides their contact number (799-3213) for contractors to reach out to.
MEMBERS ONLY DOWNLOAD
Advertisement

Similar Documents