DOCUMENT

RFP - Sutures 2008

  • YEAR CREATED: 2008
  • ENTITY TYPE: State
  • TYPE OF DOCUMENT: RFP - Request for Proposals
The document is a request for proposal (RFP) for a contract with the State. The contractor is required to comply with all applicable federal and state laws, standards, orders, and regulations throughout the term of the contract. The contractor must provide documentation to verify their compliance when requested by the State. The certification of compliance must also be included in contracts between the contractor and any subcontractors. The document includes a vendor response checklist, which outlines the required submissions and asks vendors to indicate the page numbers where their responses can be found in their bid. The checklist includes items such as a signature sheet, supplier diversity survey form, tax clearance information, immigration reform certificate, transmittal letter, timeline, methodology, experience, qualifications, references, subcontractor information, and exceptions to the RFP if applicable. The document also provides contact information for quarterly report issues and instructions for the proposal. It states that the RFP number must be referenced in all correspondence and communications related to the proposal. The procurement negotiation committee (PNC) consisting of specific entities will evaluate and award the contract. Vendors may be required to appear before the PNC to explain their understanding and approach to the project. The document also mentions that the cost of preparing the proposal is the responsibility of the vendor and provides guidelines for preparing the proposal. It emphasizes the need for separate sealed envelopes for the cost and technical proposals. The proposal must be signed by an authorized representative and include the vendor's tax number. Additionally, the document highlights the importance of acknowledging receipt of any addenda to the RFP. Failure to acknowledge these addenda may render the proposal non-responsive. It also states that changes to the RFP will only be communicated through official addenda.
MEMBERS ONLY DOWNLOAD
Advertisement

Similar Documents