DOCUMENT

IFB - Cell R1 Liner Installation

  • YEAR CREATED: 2017
  • ENTITY TYPE: County
  • TYPE OF DOCUMENT: BID - ITB, IFB, ITT, RFB
This document is a set of general conditions for a construction project. It outlines the responsibilities and obligations of the contractor in relation to the project. Some key points from the document include: - The contractor is expected to comply with all laws, regulations, and permits related to the construction project. They are responsible for any costs associated with non-compliance. - The contractor is responsible for locating and determining the position of underground structures on the construction site, and for paying the cost of digging test holes and locating utilities. - If utilities are found on the site that are not shown on the plans, the contractor must notify the county and the architect/engineer (A/E), who will provide instructions on any additional work required. - The contractor must comply with stormwater discharge requirements and secure the necessary permits. They are responsible for designating a qualified individual for site monitoring and ensuring compliance by subcontractors. - The contractor must post a sign or notice at the construction site containing information about the permit coverage and the location of the Stormwater Pollution Prevention Plan (SWPPP). - Omissions and errors in the approved Construction Schedule will not be considered as an excuse for non-compliance with the contract. - The document also covers allowances, the employment of a superintendent, and the submission of a construction schedule. Overall, the document sets out the expectations and requirements for the contractor in terms of compliance, safety, and project management. It emphasizes the contractor's responsibility to adhere to regulations and permits, as well as their obligation to properly manage the construction site and ensure compliance with stormwater discharge requirements.
MEMBERS ONLY DOWNLOAD
Advertisement

Similar Documents