NSITE DOCUMENT
7051 questions.docx
- Library: Purchissues
- Year Created: 2016
- File Type: DOCX
The document outlines various details and requirements related to the installation of Solar PV Energy Systems at multiple buildings. It covers topics such as approval of designs by KCPL, financing options for vendors, availability of existing plans for bidding, the role of contractors in verifying designs, factors considered in the selection process, access to KCPL charges, availability of structural drawings, potential roof replacements, approval of meters, verification of voltage in designs, handling modifications to roof structures, and the submission of pricing for the project.