DOCUMENT

ITB - Recycling and Disposal of Hazardous and Non-Hazardous Waste 2006

  • YEAR CREATED: 2006
  • ENTITY TYPE: County
  • TYPE OF DOCUMENT: BID - ITB, IFB, ITT, RFB
This document is a set of special conditions for a bid solicitation by Miami-Dade County for the recycling and disposal of various types of hazardous and non-hazardous waste. The document outlines specific requirements and expectations for vendors interested in bidding on the project. Some key points mentioned in the document include: - Vendors may be required to demonstrate their specialized equipment to County personnel at no additional cost to verify its capability and suitability. - The equipment used in the demonstration should be the same as the one provided during the contract period, creating an express warranty. - The contractor is responsible for disposing of waste material in the most environmentally beneficial and sound approach, such as alternate use, reuse, recycling, treatment, or land filling. - All waste disposal must comply with federal, state, and local ordinances, and appropriate documentation must be submitted for review. - Access to aircraft operating areas (AOA) at the County's Aviation Department and General Aviation Airports is strictly controlled, and vendors must comply with security requirements. - The vendor is responsible for providing all necessary labor, materials, and equipment for satisfactory contract performance, subject to inspection and approval by the County's Project Manager. - The specifications aim to comply with the Miami-Dade County Pollution Control Ordinance. - The vendor must obtain and pay for all necessary licenses, permits, and inspection fees for the project and comply with applicable laws and regulations. - The County may purchase other items not listed in the solicitation based on price quotes from the successful vendor(s), who will be required to submit written estimates for each prospective project. - The contractor is fully responsible for the acts and omissions of their sub-contractors, just as they are for their directly employed personnel. Overall, the document provides detailed guidelines and expectations for vendors interested in bidding on the recycling and disposal of waste project for Miami-Dade County. It emphasizes the importance of compliance with environmental regulations, proper waste disposal methods, and the responsibility of the contractor for the actions of their sub-contractors.
MEMBERS ONLY DOWNLOAD
Advertisement

Similar Documents