DOCUMENT

IFB - Solid Waste Management Facility, Leachate System Pump Stations, Force Main and Scada System 2010

  • YEAR CREATED: 2010
  • ENTITY TYPE: County
  • TYPE OF DOCUMENT: BID - ITB, IFB, ITT, RFB
The document is a set of general conditions for a construction project. It outlines the responsibilities and obligations of the contractor and the owner in terms of scheduling, completion of work, and documentation. The document emphasizes the importance of accurately reflecting the contractor's intent and expectations in reports and revisions. It also states that the contractor must comply with the project schedule and take necessary actions, such as increasing manpower or rescheduling activities, to ensure completion within the specified milestone and completion dates. The owner has the right to retain scheduling consultants or experts to evaluate the contractor's progress and may direct the contractor to comply with owner-prepared schedules if necessary. Additionally, the document mentions the requirement for the contractor to maintain records of drawings, specifications, and other documents at the construction site. These records shall be available to the A/E (Architect/Engineer) for review. Furthermore, upon completion of the work, the contractor is obligated to deliver these records to the owner. This ensures that all relevant documentation is properly maintained and accessible throughout the construction process and can be provided to the owner for future reference or any necessary purposes.
MEMBERS ONLY DOWNLOAD
Advertisement

Similar Documents