DOCUMENT

ITB - Install Snow Guards 2009

  • YEAR CREATED: 2009
  • ENTITY TYPE: K-12
  • TYPE OF DOCUMENT: BID - ITB, IFB, ITT, RFB
The document is a request for quotation (RFQ) from Granite School District for the installation of snow guards at Silver Hills Elementary School in Salt Lake City, Utah. The document outlines the specifications and requirements that the contractor must meet or exceed in their quotation. In addition to the specifications, the document provides information on accessing the site for a site inspection and completing the project. Interested contractors must coordinate with the project coordinator at Granite School District to arrange these activities. The document states that quoters will be required to provide a bid bond or certified check if their total price quotation is $20,000 or more. Furthermore, the successful quoter must submit full performance and payment bonds equivalent to 100% of the contract price. To resolve any conflicts or inconsistencies in the submitted documents, the specifications outlined in the RFQ document take precedence. The document also includes details about the consideration, award, and rejection of quotes. All offerors are required to submit their quotes by the specified due date and time. The evaluation process will be based on the criteria outlined in the RFQ document, and the Granite School District reserves the right to reject any or all quotes if deemed necessary.
MEMBERS ONLY DOWNLOAD
Advertisement

Similar Documents