DOCUMENT

ITB - Coaxial Transmission Line with Terminations and Groundings 2001

  • YEAR CREATED: 2001
  • ENTITY TYPE: County
  • TYPE OF DOCUMENT: BID - ITB, IFB, ITT, RFB
The document is a set of Supplementary General Conditions for a construction project. It outlines various conditions and requirements that bidders and contractors must adhere to in order to be considered for the project and to successfully complete the work. Some of the key points mentioned in the document include: - The owner has the right to investigate the qualifications of bidders and may reject any bid if the bidder is not deemed qualified. - The bidder may be required to submit information about the work they will perform, the materials and equipment they will use, and the subcontractors they will employ. - The owner has the right to object to proposed subcontractors and the bidder may need to provide acceptable substitutes. - A pre-construction conference is mandatory before the start of construction. - The contractor is responsible for supervising and directing the work, as well as coordinating all aspects of the project. - The contractor must keep the premises clean and remove all waste materials and tools at the completion of the work. - The contract requires first-class work and materials, and the owner may conduct tests to ensure compliance. - The contractor cannot deviate from the contract documents without written consent from the owner. - The owner's interpretation of the contract documents is final in case of discrepancies. - The contractor must report any discrepancies or inconsistencies in the contract documents to the owner. - The owner, the engineer, or their representatives have the authority to supervise and direct the work. - The contractor must comply with the instructions and decisions of the owner, the engineer, or their representatives. - A final inspection will be conducted, and any deficiencies must be corrected by the contractor before final acceptance of the work. - Payment will be made to the contractor based on monthly estimates, and retainage will be withheld. - Partial payments made by the owner do not indicate acceptance of defective work. Overall, the document provides guidelines and requirements for bidders and contractors to follow throughout the construction project. It also emphasizes the authority of the owner, the engineer, or their representatives in supervising and directing the work.
MEMBERS ONLY DOWNLOAD
Advertisement

Similar Documents