The document is a solicitation for a contractor to install a new cooling tower and Variable Frequency Drive (VFD) for a courthouse in the City of Newport News. The contractor is responsible for taking delivery of the equipment, painting existing steel supports, and interfacing the new cooling tower and VFD with the building's automation system. The work must comply with various building codes and regulations. The contractor must have at least five years of experience and provide references. They must also provide a warranty for the completed work and obtain necessary permits. The existing equipment must be removed and disposed of properly. The contractor must give advanced notice for crane setup and work must be scheduled with the Operations Superintendent. The work must be completed within 15 calendar days and any delays will result in liquidated damages. The contractor must also consider the building's occupancy requirements and minimize disruptions to daily operations. Various submittals, including drawings, product data, and a construction schedule, must be provided. Additionally, the contractor must provide a single-line schematic drawing of the power field hookup requirements, indicating the quality and quantity of each required utility.