DOCUMENT

BID - Sidewalk Construction 2007

  • YEAR CREATED: 2007
  • ENTITY TYPE: City/Township
  • TYPE OF DOCUMENT: BID - ITB, IFB, ITT, RFB
The document describes the requirements and specifications for the restoration of public and private property that has been disturbed or damaged during construction. The contractor is responsible for discussing with property owners the items that need to be restored and ensuring that the restoration is approved by the engineer. The contractor is not allowed to disturb any areas outside of the work limits without the property owner's consent, and any damage done must be restored at the contractor's expense. Additionally, the document provides detailed instructions on the proper methods for transplanting hedges, shrubs, and trees. It explains that the contractor should gently drag the hedge, shrub, or tree to the new planting bed or pit. The plant should be carefully slid into the hole, ensuring that it is plumb and properly aligned. Furthermore, the document includes information on the materials and construction methods required for the transplanting process. It specifies the types of soil and mulch to be used and outlines the responsibilities of the contractor, such as staking out the locations, excavating planting beds and pits, and ensuring that the plants are properly watered and handled during the transplanting process.
MEMBERS ONLY DOWNLOAD
Advertisement

Similar Documents