DOCUMENT

CONT - Construction Mana

  • ENTITY TYPE: County
  • TYPE OF DOCUMENT: CONT - Contract, Agreement
This document outlines the requirements and procedures for construction management for a project. It includes information on various subsystems such as reporting, schedule control, cost control, and project accounting. The document specifies the types of reports that need to be submitted to the County on a monthly basis, including progress reports, construction diaries, and photographs. It also outlines the need for a monthly time-scaled Critical Path Method (CPM) network schedule and bar chart schedule to plan and control progress during the construction phase. The document further explains the preparation of various schedules such as the Master Project Schedule, Pre-Bid Schedules, Construction Schedules, and Occupancy Schedule. Additionally, the document highlights the importance of maintaining a detailed Change Order history for each Trade Contract and supply contract. It specifies that the Change Order history should include information such as Change Order numbers, descriptions, proposed dates, and approved dates. This emphasizes the need for effective change management and documentation throughout the project. Furthermore, the document mentions the requirement for a cost control subsystem to assist in controlling and adjusting the work requirements and costs. It emphasizes the importance of tracking and reporting on budget, commitments, payments, and cost status. This ensures that the project stays within the allocated budget and allows for effective financial management. Overall, the document provides a comprehensive overview of the construction management process for the project, including reporting, schedule control, cost control, and project accounting. It also emphasizes the significance of maintaining a detailed Change Order history and implementing effective change management practices.
MEMBERS ONLY DOWNLOAD
Advertisement

Similar Documents