DOCUMENT

FORM - Contract Modification Amendment/Change Order Compliance

  • TYPE OF DOCUMENT: FORM - Form
The document is a Contract Modification Amendment/Change Order Compliance Form. It is a form that needs to be filled out and submitted when requesting a change order for a contract. The form includes various checkboxes and sections to certify the compliance of the proposed change order. These include confirming that the proposed work is not included in the original scope of the contract, is necessary and economical, consistent with applicable standards, cannot be practically performed under a separate contract, and has reasonable additional time and costs within the approved budget. The form also requires attachments such as a detailed description of the proposed change, an independent estimate of the change, reference to working drawings and specifications, a fixed price for the change, estimate of additional time required, itemized breakdown of costs for materials and labor, subcontractor breakdown, and any architectural or engineering drawings related to the change. The form emphasizes that it should accompany any request for a change order.
MEMBERS ONLY DOWNLOAD
Advertisement

Similar Documents