DOCUMENT

CONT - Change Order - Construction 2003

  • YEAR CREATED: 2003
  • ENTITY TYPE: City/Township
  • TYPE OF DOCUMENT: CONT - Contract, Agreement
The document is a Change Order form from the City of Lubbock. The form is used to request changes within the scope of a construction contract that do not alter the nature of the project objective. It states that any changes that do alter the nature of the project or are not integral to the project objective must be put out for public bid by the Purchasing Department. The form requires a description of the change caused by conditions encountered during construction, and it must be fully documented and itemized as to costs. The form also includes sections for itemized costs, the original contract value, the amount of the change order, and the total amount of all change orders. It requires signatures from the contractor, project architect/engineer, owner's representative, city attorney, purchasing manager, and interim city manager. Change orders over $25,000 require additional signatures from the mayor and city secretary.
MEMBERS ONLY DOWNLOAD
Advertisement

Similar Documents