DOCUMENT

IFB - Home Improvement Program and County Revitalization Program 2006

  • YEAR CREATED: 2006
  • ENTITY TYPE: County
  • TYPE OF DOCUMENT: BID - ITB, IFB, ITT, RFB
The document contains information related to the requirements and guidelines for contractors working on projects for Loudoun County. The document outlines various aspects that contractors need to consider when preparing estimates for projects. Contractors are required to provide a detailed breakdown of all charges and materials invoices, which should be based on the completion of tasks. Additionally, contractors need to include administrative costs, total project cost, a list of proposed subcontractors, and a signed statement confirming their familiarity with the scope of work after visiting the site. The document also specifies the number of calendar days required to complete the work after County authorization. The document emphasizes the importance of contractors having all the necessary information to prepare accurate estimates. Contractors are required to submit their completed estimates within ten working days for review by the County. The County reserves the right to request a revised proposal or purchase services from another contractor if the start and completion time or price are not satisfactory. Furthermore, the document includes provisions related to workmanship and inspection, cleanliness of the work area, compliance with disability legislation, ethics in public contracting, employment discrimination, drug-free workplace, and tax exemption. It states that the County may periodically spot check cost proposals to ensure the contractor has provided the lowest reasonable price. Overall, the document provides detailed guidelines and requirements for contractors working on projects for Loudoun County. It covers various aspects such as estimates, breakdown of charges and materials, workmanship, cleanliness, compliance with legislation, and ethical considerations.
MEMBERS ONLY DOWNLOAD
Advertisement

Similar Documents