DOCUMENT

IFB - Concrete Work 2007

  • YEAR CREATED: 2007
  • ENTITY TYPE: Authority: Housing
  • TYPE OF DOCUMENT: BID - ITB, IFB, ITT, RFB
This document outlines the terms and conditions for a construction contract with KCDC (Knoxville's Community Development Corporation). The proposer is responsible for maintaining a clean work site, removing debris, and disposing of it properly. They must also coordinate the operations of all trades, subcontractors, and materials suppliers. If the project exceeds a certain threshold, the proposer must provide performance and payment bonds. All work must comply with the requirements of authorities having jurisdiction. The bidder must commence work within a specified timeframe and failure to meet estimated start and completion dates may result in contract termination. The contract length is two years with three one-year renewal options. The bidder is responsible for demolition, debris removal, and keeping the premises free of debris. They must also ensure job safety, protect property, and comply with safety regulations. The bidder must protect existing and newly installed work and repair any damages. They must also minimize inconvenience to the public and coordinate construction to maintain traffic flow. In case of emergencies, work must commence within 24 hours or KCDC may hire another bidder. Only authorized employees are allowed on KCDC premises. KCDC may request estimates for non-emergency work and the bidder must provide a detailed estimate within five working days. Proper identification and insurance coverage are required. Invoices must be accompanied by daily work tickets and authorized for payment. All proposers must be properly licensed, and failure to submit copies of licenses may result in bid rejection. The document also mentions that neither the final payment nor any part of the retained percentage is due until the bidder fulfills all contractual obligations, including the removal of any liens on the project.
MEMBERS ONLY DOWNLOAD
Advertisement

Similar Documents