DOCUMENT

IFB - Exterior Facility Maint 2003

  • YEAR CREATED: 2003
  • ENTITY TYPE: Authority: Public Health
  • TYPE OF DOCUMENT: BID - ITB, IFB, ITT, RFB
The document contains information related to a project involving the Washington Suburban Sanitary Commission. It includes details about the cost breakdown, equipment cost, subcontractor cost, and bond cost. There is also statistical data provided for labor hours for the years 2002-2003 and 2001-2002. The document further includes the Minority Business Enterprise Program adopted by the Commission, which outlines the procedures for implementing the program in procurement functions. The policy objectives of the program are mentioned, along with definitions of terms such as minority person, minority-owned firm, bidder, prime contractor, and more. Additionally, the document highlights the requirement for joint ventures to be considered MBE controlled and specifies that for Request for Proposals (RFPs), the minority-owned firm must have certain qualifications.
MEMBERS ONLY DOWNLOAD
Advertisement

Similar Documents