IFB - Flooring Replacement - DMV 2010

  • YEAR CREATED: 2010
  • ENTITY TYPE: State
  • TYPE OF DOCUMENT: BID - ITB, IFB, ITT, RFB
The document is a question and answer session regarding a bid for a construction project in California. The person asking the questions is seeking clarification on various aspects of the bid process, including the requirement to use a DVBE (Disabled Veteran Business Enterprise) subcontractor, the need for a concrete sealer, the requirement for a bid bond, the need for a transition molding, and the implications of not using a DVBE subcontractor. The answers provided clarify that a DVBE subcontractor must be utilized for bids over $10k, there is no moisture barrier required for the project, a bid bond is required for bids over $147,000.00, a transition stripe is required for the new carpet, and the use of a DVBE subcontractor is mandatory for the bid. The document also includes a correction to the phone number provided for Kevin Childers, the DVBE advocate.